In Reply to: Building a Stage posted by JimBop on January 27, 2012 at 14:25:22:
you want the floor joist 12-14" apart from each other (gear is heavy). take 5 gal paint buckets and halfway fill them with sand, place them under the stage. take pieces of shag carpet and go across the floor joist under the stage and they need to be wide enough to touch the ground.