In Reply to: Building a Stage posted by JimBop on January 27, 2012 at 14:25:22:
I think the opposite....BOND the 2x12's to the concrete with a
bead of construction or polyurethane adhesive. Using glue under the
subfloor is a good idea, with screws every 12" seems good. I don't
know the joist spacing, but 3/4" minimum subfloor I would think.
I don't think any fiberglass would be needed if you close the ends
and front off. If you bond it to the slab, it'll be super solid, I
doubt if resonances would be a problem.
This post is made possible by the generous support of people like you and our sponsors:
Follow Ups
- RE: Building a Stage - Coner 20:01:44 01/28/12 (0)